{"id":42508,"date":"2025-05-21T12:08:09","date_gmt":"2025-05-21T09:08:09","guid":{"rendered":"https:\/\/www.epias.com.tr\/?p=42508"},"modified":"2026-03-03T10:46:56","modified_gmt":"2026-03-03T07:46:56","slug":"kurban-bayrami-holiday-colleteral-calculation-2","status":"publish","type":"post","link":"https:\/\/www.epias.com.tr\/en\/announcements\/market\/electricity\/kurban-bayrami-holiday-colleteral-calculation-2\/","title":{"rendered":"Kurban Bayram\u0131 Holiday Colleteral Calculation"},"content":{"rendered":"<p>The \u201ck\u201d value is used in the Day Ahead \u2013 Intraday Market collateral (DAM-IM) calculations and it represents the last \u201ck\u201d days in which the commercial transactions in these two markets are different than zero in last 30 days. Within the scope of Collateral Calculation Procedure, for public holidays longer than two days, the \u201ck\u201d number is 1 (one) more than the number of days on the holiday.<\/p>\n<p>In cases where the \u201ck\u201d value is greater than three, for the total collateral calculation the following rules are applied:<\/p>\n<p>75% of the amount calculated over the \u201ck\u201d number is used on workdays before the holiday<\/p>\n<p>100% of the amount calculated over the \u201ck\u201d number is used on workdays following the holiday<\/p>\n<p>Kurban Bayram\u0131 Holiday, fort he DAM-IM collateral calculation to be made on 3<sup>rd<\/sup>, 4<sup>th<\/sup> and 10<sup>th <\/sup>of June the number of \u201ck\u201d days is <strong>6 (six).<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-42523\" src=\"https:\/\/www.epias.com.tr\/wp-content\/uploads\/2025\/05\/2025-kurban-b.-tablo-ing-2-300x148.png\" alt=\"\" width=\"795\" height=\"392\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The \u201ck\u201d value is used in the Day Ahead \u2013 Intraday Market collateral (DAM-IM) calculations and it represents the last \u201ck\u201d days in which the commercial transactions in these two markets are different than zero in last 30 days. Within the scope of Collateral Calculation Procedure, for public holidays longer than two days, the \u201ck\u201d [&hellip;]<\/p>\n","protected":false},"author":17,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[84,79,81],"tags":[],"class_list":["post-42508","post","type-post","status-publish","format-standard","hentry","category-collateral","category-electricity","category-market"],"_links":{"self":[{"href":"https:\/\/www.epias.com.tr\/en\/wp-json\/wp\/v2\/posts\/42508","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.epias.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.epias.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.epias.com.tr\/en\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.epias.com.tr\/en\/wp-json\/wp\/v2\/comments?post=42508"}],"version-history":[{"count":1,"href":"https:\/\/www.epias.com.tr\/en\/wp-json\/wp\/v2\/posts\/42508\/revisions"}],"predecessor-version":[{"id":44579,"href":"https:\/\/www.epias.com.tr\/en\/wp-json\/wp\/v2\/posts\/42508\/revisions\/44579"}],"wp:attachment":[{"href":"https:\/\/www.epias.com.tr\/en\/wp-json\/wp\/v2\/media?parent=42508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.epias.com.tr\/en\/wp-json\/wp\/v2\/categories?post=42508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.epias.com.tr\/en\/wp-json\/wp\/v2\/tags?post=42508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}