Initial Collateral
- 200.000 TL for participants with Distribution, Transmission and Supply licenses,
- 10,000 TL for participants with a generation or OIZ generation license if the installed capacity in the enterprise is 50 MW or less,
- If it is between 50-1000 MW, the installed capacity times 200 TL/MW,
- If it is over 1000 MW, it is 200.000 TL.
In case of a change in the installed capacity of a market participant in the business, the initial collateral required from the relevant market participant is recalculated according to the current installed power value.